Team #:
111313 Team members: Dullaga/Ilao Class/grade: Physics 11 Year: 2013 Mass supported: 32.65 kg Placement tier: middle third Placement: 28th out of 51 bridges Description: truss bridge with centre queen posts. Comments: truss design with parallel queen posts. Uses double stacked horizontal beams. Upper beams of main triangle have been shaved back to get structure under 100.0g limit. |
Other Bridges of the Week 1 2 3 4 5 |
|
Bridge of the Week |
Marquee and Platinum Sponsors | |||
Back to main site