Team #: 111317 Team members: Farinas/Maciejewski Class/grade: Physics 11 Year: 2013 Mass supported: 21.75 kg Placement tier: lower third Placement: 38th out of 51 bridges Description: arch bridge with high road Comments: arch with tie rod above the 5 cm clearance mark. The arch is not particularly strong, having minimal lamination. Mass could have been transferred from the unnecessarily thick roadway. This roadway needs strength only at the load application points and not along its entire length. |